Foundation repair at a colonial with an attached garage and an addition in Farmington CT
Challenge
Project Objective: Repair cracks in the concrete floor slab, foundation walls, footings and correct tip out chimney.
Property Conditions: Present owner acquired the Colonial style house in 2003. The house is a wood frame structure with an attached two car garage with a studio above and a “Family Room” addition in the back with a brick fireplace chimney and a full basement. The foundations, footings and floor slabs are poured concrete. The grade is level in the front but slopes down to the rear by six feet, exposing fully rear foundation of the addition and segment of the garage.
Problem: At the time of purchase visible in the addition and the garage were minor cracks in the foundation, floor slab and some foundation settling. The chimney was slightly separating from the upper walls and developing a stress crack at the foundation level. By the spring of 2013 all concrete cracks became significantly and dangerously larger, as the structural settlement was visible in the finished quarters and the brick chimney was tipping out.
Solution
Solution: Connecticut Basement Systems Inc., proposed and installed the “Push Piers” to lift the concrete footings and walls of the family room addition, garage and the brick chimney. This is a permanent solution to the problem of concrete foundation stress cracks and settlement due to destabilization of the soil.
Result: Foundations were stabilized, affected elements were lifted 1 ½” to the original construction level – cracks were closed and the chimney is not tipping out. It took only three days – excavation to the final grading and concrete restoration – thanks to the effective planning and crew expertise. This technique results in the minimal disruption to the surrounding environment and negligible inconvenience to the occupants.
Project Summary
Certified Contractor/Installer: Connecticut Basement Systems Inc.
Structural Engineer: Hayman Engineering, Inc.
Products Installed: Foundation SupportWorks Model 288 Helical pile system with retrofit bracket and cap resulting in "Push Pier" system. 16 Total piers were installed. Minimum load capacity of each pier 31 kips